Gateway 8400 Uživatelský manuál Strana 1

Procházejte online nebo si stáhněte Uživatelský manuál pro Počítače Gateway 8400. Gateway 8400 User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk

Shrnutí obsahu

Strany 1 - Installation Guide

8400 Server Rackmount Installation GuideA MAN US 8400 RACK GDE R0 5/00

Strany 2 - Contents

Converting to rackmount 53Beginning at the top left inside edge of the bezel, depress the plastic retention tabs toward the outside edge of t

Strany 3 - Trademark acknowledgments

6 InstallationRemoving the feet To remove the feet:1 Turn the server upside down.2 Using a flat-bladed screwdriver, remove the screws securin

Strany 4 - Convention Description

Converting to rackmount 7Installing the chassis handles To install the chassis handles:1 Place the server on its side, like it will be instal

Strany 5 - Information about your system

8 InstallationInstalling the system drawer side railsBefore installing the server (system drawer) in the cabinet, you need to install the sys

Strany 6 - Installation

Installing the cabinet mounting brackets and mounting rails 9Installing the cabinet mounting brackets and mounting railsIf you are installing

Strany 7 - Converting to rackmount

10 Installation3 Attach the front mounting bracket to the front vertical mounting rail using two screws from the accessory kit.4 Position the

Strany 8

Installing the cabinet mounting brackets and mounting rails 11Installing the cabinet mounting rails onto Gateway brackets To install the cabi

Strany 9 - Changing the bezel

12 Installation3 Align the front of the cabinet mounting rail to the front mounting bracket by sliding the inner rail and inner slide until t

Strany 10 - To install the rack bezel:

Installing the cabinet mounting brackets and mounting rails 13Installing generic mounting bracketsIf you are installing the server in a non-G

Strany 11 - Removing the feet

14 Installation4 Position the back mounting bracket (longer bracket) on the back vertical mounting rail.5 Attach the back mounting bracket to

Strany 12

iContentsPreface. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i

Strany 13 - 8 Installation

Installing the cabinet mounting brackets and mounting rails 152Attach the back end of the cabinet mounting rail to the back mounting bracket

Strany 14

16 InstallationMounting the system drawer in the cabinet To mount the system drawer in the cabinet:1 Pull both of the inner rails forward unt

Strany 15 - 10 Installation

Mounting the system drawer in the cabinet 173Lift the system drawer to the same height as the inner rails, then align the system drawer side

Strany 16 - Gateway brackets

18 Installation5 Press the latches on both sides of the system drawer side rails, then push the system drawer back until the inner rail sprin

Strany 17

Installing the cable retractor 19Installing the cable retractorCable retractors reduce strain on the drawer cables and connectors and simplif

Strany 18

20 InstallationInstalling a cable retractor in a non-Gateway cabinet To install a cable retractor in a non-Gateway cabinet:1 Remove the adapt

Strany 19 - 14 Installation

Completing the connections 21Attaching the cables to the retractor To attach the cables:1 Route the cables from the back of the system drawer

Strany 20 - Spring latch

22 InstallationConnecting a single system drawer To connect the peripherals:1 Turn off all system drawers and devices in the cabinet before a

Strany 21 - 16 Installation

Completing the connections 23Connecting multiple system drawersMultiple system drawers installed in a cabinet can share a single set of perip

Strany 22

24 InstallationThe system I/O connectors may appear different than in the illustration, depending on the system board installed in the server

Strany 23 - 18 Installation

ii NoticesCopyright © 2000 Gateway, Inc.All Rights Reserved4545 Town Centre CourtSan Diego, CA 92121 USAAll rights reservedThis publication i

Strany 24 - Back vertical

Completing the connections 25Connecting the powerGateway recommends that a licensed electrician install a dedicated 230 VAC line, with suffic

Strany 25 - 20 Installation

26 InstallationIf rack mounted units are installed in a closed or multi-rack cabinet, they may require further evaluation by Certification Ag

Strany 26 - Completing the connections

Turning off the system drawer 277When the system drawer starts successfully, install the operating system, if necessary.8 Turn on the other s

Strany 27 - To connect the peripherals:

28 InstallationSecuring the system drawer in the cabinet To secure the system drawer:1 Close the back door of the system cabinet, then lock i

Strany 28

8400 Server Rackmount Installation GuideA MAN US 8400 RACK GDE R0 5/00

Strany 29 - 24 Installation

Conventions used in this manual iiiPrefaceConventions used in this manualThroughout this manual, you will see the following conventions:Conve

Strany 30 - Connecting the power

iv Information about your systemAccessing the server system manualA comprehensive 8400 Server System Manual is located on the Server Companio

Strany 31 - Turning on the system drawer

11InstallationThis guide provides information on converting your Gateway server to a rackmount configuration and installing your Gateway ser

Strany 32 - Turning off the system drawer

2 InstallationConverting to rackmountTo convert the server to a standard 19-inch (48.26 cm) rack-mountable drawer, you need to remove the unn

Strany 33 - To secure the system drawer:

Converting to rackmount 35Remove the two screws securing the front access panel to the chassis.6 Slide the front access panel to the back and

Strany 34

4 InstallationChanging the bezel To remove the tower bezel:1 With the tower in the upright position, open the system door and lift the door s

Komentáře k této Příručce

Žádné komentáře